Google Translate
Concept masterplan
Initial concept designs for the park.
Great news, the future dry play has been fast-tracked, check out the final design to see what’s coming.
![](https://hdp-au-prod-app-cbnks-haveyoursay-files.s3.ap-southeast-2.amazonaws.com/9615/9064/2556/Concept_Masterplan_Hotspot.jpg)
Before and After
Drag the slider to see the before and after photos.
Splash pad and water play
Water-based equipment including mega soakers and water play areas.
![After: After](https://hdp-au-prod-app-cbnks-haveyoursay-files.s3.ap-southeast-2.amazonaws.com/6015/8941/7859/After2.jpg)
![Before: Before](https://hdp-au-prod-app-cbnks-haveyoursay-files.s3.ap-southeast-2.amazonaws.com/3615/8941/7819/Before_2.jpg)
Dry Play
Dry playground equipment including slides and swings.
![After: After](https://hdp-au-prod-app-cbnks-haveyoursay-files.s3.ap-southeast-2.amazonaws.com/7115/8941/7898/After3.jpg)
![Before: Before](https://hdp-au-prod-app-cbnks-haveyoursay-files.s3.ap-southeast-2.amazonaws.com/2415/8941/7938/Before_3.jpg)